Last updated 2/22/2011
Major projects currently before the Planning Board are listed below with details on the status of the projects. Actions taken are listed in bold text.
If you would like to see a project added to this list, or you have questions, please contact the Planning & Zoning office at the Town Hall by phone at 585-742-5040 or by e-mail.
ST. JOHN'S SENIOR COMMUNITY - MORRELL (aka Route 444 Project)
State Route 444
Senior Community Development proposal on 60 acres consisting of 96 senior townhomes, 24 senior patio homes & Two (2) ten unit St. John's Green homes.
- Informal discussion at 1/26/10 Planning Board meeting - No Action Taken
Applicant is seeking to rezone 32.2 acres located on NYS Route 444 to Residential 2 (R2), Multiple Dwelling (MD) and Senior Citizen (SC). Property owner is requesting 24 detached patio homes, 96 fee-simple townhomes and 2 ten bed senior living apartment buildings.
- Planning Board approved recommendation for rezoning to Town Board on 12/14/10
AUBURN HILLS
Applicant is requesting a subdivision of the southwest and northwest corners of Cork Road and Modock Road, extending north to Route 251, all consisting of approximately 142 acres. Applicant is proposing 71 signle family lots. Access to the site will be from Modock Road.
- Planning Board as new application on 12/14/10. No Action Taken
- Planning Board acknowledged receipt of complete sketch plat on 1/11/11
PLASTERMILL ROAD
Applicant is requesting to create 27 lots on 54 acres.
- March 8, 2011 before the Planning Board
KUMPF SUBDIVISION
670 County Road 9
Applicant is requesting to subdivide 48.6 acres into 24 lots
AUBURN CREEK RESIDENTIAL APARTMENT COMMUNITY
733 State Route 251
Applicant is requesting to rezone the 100 acre site from Light Industrial to Multiple Dwelling and are proposing 184 apartment units. The units include both one and two bedroom apartments, contained within two-story eight (8) unit buildings.
- Planning Board approved recommendation to Town Board for rezoning on 12/14/10
- Town Board seeking Lead Agency status for SEQR compliance
VICTOR CROSSING (formerly know as Victor Commerce Park) - Benderson Development
NYS Route 96
- The February 2003 Draft Environmental Impact Statement is available online at the Victor Commerce Park website.
- Applicant submitted a preliminary final environmental impact statement (EIS) for review by the board. The document proposes a reduced square footage development of three hundred nine thousand, seven hundred eighty-seven (309,787) square feet of retail in two buildings and thirteen thousand five hundred (13,500) square feet for two (2) restaurants.
- Scheduled for Final Environmental Impact Statement discussion on 9/13/2005 but was withdrawn from agenda by applicant.
- Applicant's representative indicated additional material will be submitted to the Planning board in February or March (2006).
- Applicant submitted "draft" FEIS on 5/25/2006 with revisions on 6/5/2006. Scheduled for completeness determination 7/18/2006.
- Planning Board voted to prepare the FEIS and make completeness determination by 8/8/2006 meeting.
- The August 2006 Final Environmental Impact Statement is available online at Benderson's Victor Commerce Park website
- FEIS adopted on 9/26/2006. The Planning Board Findings Statement is available in pdf format.
- Informal discussion on revised Site Plan held on 10/17/2006.
- Amended Site Plan and Subdivision application submitted on 12/12/2006 for the construction of not more than 323,387 square feet of retail and restaurant space, associated parking and site improvements.
- A modified site plan application was received by the Planning Board in December 2007. The application was to modify the approved site plan building footprint to accommodate a proposed Kohl’s store. The overall development square footage of 323,287 square feet will remain the same. The Planning Board approved the site plan modification on June 17, 2008.
- Wal-Mart complete
- Kohl's complete
- Applicant returned to Planning Board on 2/8/11 to request a minor site plan modification to accommodate proposed tenants as well as to add an upgraded sidewalk plan throughout the shopping center and a pedestrian-centered focal point.
LEHIGH CROSSING (Formerly Bluestone Creek Technology Park)
County Road #42 (Wangum Road)
Sketch plan application for the subdivision of 56 acres into a Ten (10) lot industrial/technology park.
- Appeared before the Planning Board on 4/14/2009. Feedback given by Board. No action taken.
- Appeared before Planning board on 12/15/09 as Lehigh Crossing with revised Sketch Plan for 12 lot subdivision
- Sketch Plan accepted as complete on 1/12/10
Applicant returned to Planning Board requesting to subdivide 56.3 acres into a 12 lot industrial park with a maximum square footage of 535,000. This project will be developed in two phases with six (6) lots in each.
- LEAD AGENCY was established at the 8/24/10 meeting.
VICTOR OUTPARCEL DEVELOPMENT
State Route 96
Site Plan for the construction of a 7,138 sq Ft restaurant on 10.01 acres.
- Site Plan Approved by the Planning board on 9/9/2008.
Application was approved September 2008 and has expired.
Applicant is reapplying to construct a 7,138 square foot restaurant on approximately 10 acres within the Hampton Inn Development.
- Item was reapproved August 16, 2010
- FIRST 90 DAY EXTENSION - APPROVED 1/25/11
FISHERS RIDGE (Formerly Town Square)
State Route 96
The project is planned to be developed in states and to ultimately include approximately 750,000 square feet of building floor area, including approximately 550,000 square feet of commercial space, a 100,000 square foot hotel and approximately 100,000 square feet of office and residential space. The application is under the State Environmental Quality Review (SEQR) process. The basic purpose of SEQR is to incorporate the consideration of environmental factors into the existing planning, review and decision making processes of state, regional and local government agencies at the earliest possible time. To accomplish this, SEQR requires that all agencies determine whether the actions they directly undertake, fund or approve may have a significant impact on the environment, and if it is determined that the proposed project may have a significant adverse impact, an environmental impact statement is prepared. The Planning Board had determined themselves to be Lead Agency on this project. They also issued a Positive Declaration which means that the proposed action may result in a significant adverse impact on the environment and therefore, a Draft Environmental Impact Statement must be prepared. A scoping hearing was held in December of 2007 and January of 2008 to focus the environmental impact statement on potentially significant adverse impact and to eliminate consideration of those impacts that are irrelevant or non-significant. The scoping outline of issues was adopted by the Planning Board on February 12, 2008.
- The Planning Board declared themselves Lead Agency and issued a Positive Declaration on November 13, 2007. The Scoping Outline for the DEIS is available in pdf format.
- Public Scoping Session was held on December 18, 2007 and held open until January 8, 2008.
- Continuation of scoping session held on 1/22/2008.
- Final scoping outline adopted on 2/12/2008.
- DEIS deemed inadequate 2/23/10
VALENTOWN PLAZA
State Route 96 & High Street
Resubdivision of approximately 9.3 acres to three (3) lots. Site Plan for the construction of two (2) single story retail buildings, one of 19,300 s.f. and the other of 5,650 s.f.
- Informal discussion on 8/8/2006.
- Public Hearing scheduled for 11/14/2006.
- Minor Subdivision and Site Plan approved w/conditions on 5/22/2007.
- Preconstruction meeting held on 12/12/2007.
- Project under construction.
- Longhorn Steakhouse - Architectural Review Committee approved elevations 6/23/2009.
- Longhorn Steakhouse complete
VICTOR TERRACE
State Route 96
Reapproval request of a site plan requested for a two-story mixed use building with 15 commercial/retail tenants on the first floor and 18 apartments on the 2nd floor.